John Lever
Moderator
I spoke to Bevan recently and tried to find out if he knew anything about the future of RM. The only thing he could say was that everything was packed into a 40 ft container and sent off shore. By everying I assume to be patterns samples and machines. Two of the team will monitor production and oversee quality control.
Any ideas ?
Any ideas ?